cp_schedule
Purpose
Optimizes the schedule with respect to an objective variable.
Synopsis
function cp_schedule(obj:cpvar) : integer
function cp_schedule(obj:cpfloatvar) : integer
function cp_schedule(obj:cpfloatvar, maximization:boolean) : integer
function cp_schedule(obj:cpvar, maximization:boolean) : integer
Arguments
|
obj
|
the objective variable
|
|
maximization
|
true for maximization of the objective and
false for minimization (default: minimization)
|
Return value
0 if schedule is inconsistent, 1 if schedule is suboptimal, 2 if schedule is optimal
Related topics
© 2001-2021 Fair Isaac Corporation. All rights reserved. This documentation is the property of Fair Isaac Corporation ("FICO"). Receipt or possession of this documentation does not convey rights to disclose, reproduce, make derivative works, use, or allow others to use it except solely for internal evaluation purposes to determine whether to purchase a license to the software described in this documentation, or as otherwise set forth in a written software license agreement between you and FICO (or a FICO affiliate). Use of this documentation and the software described in it must conform strictly to the foregoing permitted uses, and no other use is permitted.
