Subroutines
insight_end_initializations |
Indicates that initializations are completed
|
insight_minimize, insight_maximize |
Solves the optimization problem
|
insight_reset_progress |
Reset progress metrics
|
insight_results_available |
Initiate early capture of model results
|
insight_update |
Update single progress metric
|
insight_update_progress |
Update all progress metrics
|
insight_use_original_data |
Distinguish model load and run
|
insightgetprojattach |
Retrieves a project attachment from the Insight server, placing it in the Mosel working directory where it can be read by the model.
|
insightlistprojattach |
Retrieves a list of all the files attached to the project.
|
insightlistprojattachbytag |
Retrieves a list of all the files attached to the project with the given tag.
|
insightprojattachinfo |
Retrieves information about a given project attachment
|
© 2001-2019 Fair Isaac Corporation. All rights reserved. This documentation is the property of Fair Isaac Corporation (“FICO”). Receipt or possession of this documentation does not convey rights to disclose, reproduce, make derivative works, use, or allow others to use it except solely for internal evaluation purposes to determine whether to purchase a license to the software described in this documentation, or as otherwise set forth in a written software license agreement between you and FICO (or a FICO affiliate). Use of this documentation and the software described in it must conform strictly to the foregoing permitted uses, and no other use is permitted.