Els - An economic lot-sizing problem solved by cut-and-branch and branch-and-cut heuristics


Type: Lot-sizing
Rating: 5 (difficult)
Description: The version 'xbels' of this example shows how to implement cut-and-branch (= cut generation at the root node of the MIP search) and 'xbelsc' implements a branch-and-cut (= cut generation at the MIP search tree nodes) algorithm using the cut manager.
File(s): xbels.java, xbelsc.java


xbels.java
/********************************************************
  Xpress-BCL Java Example Problems
  ================================

  file xbels.java
  ```````````````
  Economic lot sizing, ELS, problem, solved by adding
  (l,S)-inequalities) in several rounds looping over 
  the root node.
  
  ELS considers production planning over a horizon
  of T periods. In period t, t=1,...,T, there is a
  given demand DEMAND[t] that must be satisfied by
  production prod[t] in period t and by inventory
  carried over from previous periods. There is a
  set-up up cost SETUPCOST[t] associated with
  production in period t. The unit production cost
  in period t is PRODCOST[t]. There is no inventory
  or stock-holding cost.

  (c) 2008 Fair Isaac Corporation
      author: S.Heipcke, 2001, rev. Mar. 2011
********************************************************/

import com.dashoptimization.*;

public class xbels
{
 static final double EPS = 1e-6;
 static final int T = 6;                 /* Number of time periods */

/****DATA****/
 static final int[] DEMAND    = { 1, 3, 5, 3, 4, 2};  /* Demand per period */ 
 static final int[] SETUPCOST = {17,16,11, 6, 9, 6};  /* Setup cost / period */
 static final int[] PRODCOST  = { 5, 3, 2, 1, 3, 1};  /* Prod. cost / period */
 static int[][] D;                       /* Total demand in periods t1 - t2 */

 static XPRBvar[] prod;                  /* Production in period t */
 static XPRBvar[] setup;                 /* Setup in period t */

 static XPRB bcl;
 static XPRBprob p;

/***********************************************************************/

 static void modEls() throws XPRSexception
 {
  int s,t,k;
  XPRBexpr cobj,le; 
  
  bcl = new XPRB();                     /* Initialize BCL */
  p = bcl.newProb("Els");               /* Create a new problem in BCL */
  XPRS.init();                          /* Initialize Xpress-Optimizer */

  D = new int[T][T];
  for(s=0;s<T;s++)
   for(t=0;t<T;t++)
    for(k=s;k<=t;k++)
     D[s][t] += DEMAND[k];

/****VARIABLES****/
  prod = new XPRBvar[T];
  setup = new XPRBvar[T];
  for(t=0;t<T;t++)
  {
   prod[t]=p.newVar("prod" + (t+1));
   setup[t]=p.newVar("setup" +(t+1), XPRB.BV);   
  }

/****OBJECTIVE****/
  cobj = new XPRBexpr();
  for(t=0;t<T;t++)                      /* Minimize total cost */
   cobj .add(setup[t].mul(SETUPCOST[t]) .add(prod[t].mul(PRODCOST[t])) );
  p.setObj(cobj);

/****CONSTRAINTS****/
         /* Production in period t must not exceed the total demand for the
            remaining periods; if there is production during t then there
            is a setup in t */
  for(t=0;t<T;t++)
   p.newCtr("Production", prod[t] .lEql(setup[t].mul(D[t][T-1])) ); 

         /* Production in periods 0 to t must satisfy the total demand
            during this period of time */
  for(t=0;t<T;t++)
  {
   le = new XPRBexpr();
   for(s=0;s<=t;s++) le .add(prod[s]);
   p.newCtr("Demand", le.gEql(D[0][t]) );
  }
 }

/**************************************************************************/
/*  Cut generation loop at the top node:                                  */
/*    solve the LP and save the basis                                     */
/*    get the solution values                                             */
/*    identify and set up violated constraints                            */
/*    load the modified problem and load the saved basis                  */
/**************************************************************************/
 static void solveEls() throws XPRSexception
 {
  double objval;               /* Objective value */
  int t,l;
  int starttime;
  int ncut, npass, npcut;      /* Counters for cuts and passes */
  double[] solprod, solsetup;  /* Solution values for var.s prod & setup */
  double ds;
  XPRSprob op;
  XPRBbasis basis;
  XPRBexpr le;

  starttime=XPRB.getTime();
  op=p.getXPRSprob();
  op.setIntControl(XPRS.CUTSTRATEGY, 0);
                               /* Disable automatic cuts - we use our own */
  op.setIntControl(XPRS.PRESOLVE, 0);
                               /* Switch presolve off */
  ncut = npass = 0;
  solprod = new double[T];
  solsetup = new double[T];

  do
  {
   npass++;
   npcut = 0;
   p.lpOptimize("p");          /* Solve the LP */
   basis = p.saveBasis();      /* Save the current basis */
   objval = p.getObjVal();     /* Get the objective value */

      /* Get the solution values: */
   for(t=0;t<T;t++)
   {
    solprod[t]=prod[t].getSol();
    solsetup[t]=setup[t].getSol();
   }
  
      /* Search for violated constraints: */
   for(l=0;l<T;l++)
   {
    for(ds=0.0, t=0; t<=l; t++)
    {
     if(solprod[t] < D[t][l]*solsetup[t] + EPS)  ds += solprod[t];
     else  ds += D[t][l]*solsetup[t];
    }

      /* Add the violated inequality: the minimum of the actual production
         prod[t] and the maximum potential production D[t][l]*setup[t] 
         in periods 0 to l must at least equal the total demand in periods 
         0 to l.
         sum(t=1:l) min(prod[t], D[t][l]*setup[t]) >= D[0][l]
       */
    if(ds < D[0][l] - EPS) 
    {
     le = new XPRBexpr();
     for(t=0;t<=l;t++) 
     {
      if (solprod[t] < D[t][l]*solsetup[t] + EPS)
       le .add(prod[t]);
      else
       le .add(setup[t].mul(D[t][l]));
     }
     p.newCtr("cut" +(ncut+1), le.gEql(D[0][l]) );
     ncut++; 
     npcut++;
    }
   }
   
   System.out.println("Pass " +npass + " (" +(XPRB.getTime()-starttime)/1000.0 
      + " sec), objective value " + objval + ", cuts added: " + npcut 
      + " (total " + ncut +")");

   if(npcut==0) 
    System.out.println("Optimal integer solution found:");
   else
   { 
    p.loadMat();                 /* Reload the problem */
    p.loadBasis(basis);          /* Load the saved basis */
    basis = null;                /* No need to keep the basis any longer */
   }
  } while(npcut>0);

      /* Print out the solution: */
  for(t=0;t<T;t++)
   System.out.println("Period " + (t+1) + ": prod " + prod[t].getSol()
      + " (demand: " + DEMAND[t] + ", cost: " + PRODCOST[t] + "), setup " 
      + setup[t].getSol() + " (cost: " + SETUPCOST[t] + ")"); 
 }

/***********************************************************************/

 public static void main(String[] args) throws XPRSprobException, XPRSexception
 {
  modEls();                      /* Model the problem */
  solveEls();                    /* Solve the problem */
 } 
}

xbelsc.java
/********************************************************
  Xpress-BCL Java Example Problems
  ================================

  file xbelsc.java
  ````````````````
  Economic lot sizing, ELS, problem, solved by adding
  (l,S)-inequalities) in a branch-and-cut heuristic 
  (using the cut manager).
  
  ELS considers production planning over a horizon
  of T periods. In period t, t=1,...,T, there is a
  given demand DEMAND[t] that must be satisfied by
  production prod[t] in period t and by inventory
  carried over from previous periods. There is a
  set-up up cost SETUPCOST[t] associated with
  production in period t. The unit production cost
  in period t is PRODCOST[t]. There is no inventory
  or stock-holding cost.

  (c) 2008 Fair Isaac Corporation
      author: S.Heipcke, 2005, rev. Mar. 2011
********************************************************/

import java.util.*;
import com.dashoptimization.*;

public class xbelsc
{
 static final double EPS = 1e-6;
 static final int T = 6;                 /* Number of time periods */

/****DATA****/
 static final int[] DEMAND    = { 1, 3, 5, 3, 4, 2};  /* Demand per period */ 
 static final int[] SETUPCOST = {17,16,11, 6, 9, 6};  /* Setup cost / period */
 static final int[] PRODCOST  = { 5, 3, 2, 1, 3, 1};  /* Prod. cost / period */
 static int[][] D;                       /* Total demand in periods t1 - t2 */

 static XPRBvar[] prod;                  /* Production in period t */
 static XPRBvar[] setup;                 /* Setup in period t */

 static XPRB bcl;
 static XPRBprob p;

 static class myobj {
     XPRBprob prob;
     double tol;
 };

/**************************************************************************/
/*  Cut generation algorithm:                                             */
/*    get the solution values                                             */
/*    identify and set up violated constraints                            */
/*    add cuts to the problem                                             */
/**************************************************************************/
 static class CutMgrCallback implements XPRScutMgrListener
 {
  public int XPRScutMgrEvent(XPRSprob oprob, Object data)
  {
   int t,l;
   boolean res;
   int ncut;                    /* Counter for cuts */
   double[] solprod, solsetup;  /* Solution values for var.s prod & setup */
   double ds;
   XPRBexpr le;
   ArrayList<XPRBcut> cutlist;
   XPRBcut[] cuts;
   myobj mo;

   mo = (myobj)data;
 
   ncut = 0;
   cutlist = new ArrayList<XPRBcut>();
   try {
      /* Get the solution values */
    mo.prob.beginCB(oprob);
    mo.prob.sync(XPRB.XPRS_SOL);  

    solprod = new double[T];
    solsetup = new double[T];
    for(t=0;t<T;t++)
    {
     solprod[t]= prod[t].getSol();     
     solsetup[t]= setup[t].getSol();    
    }
     
      /* Search for violated constraints: */
    for(l=0;l<T;l++)
    {
     for(ds=0.0, t=0; t<=l; t++)
     {
      if(solprod[t] < D[t][l]*solsetup[t] + mo.tol)  ds += solprod[t];
      else  ds += D[t][l]*solsetup[t];
     }

      /* Add the violated inequality: the minimum of the actual production
         prod[t] and the maximum potential production D[t][l]*setup[t] 
         in periods 0 to l must at least equal the total demand in periods 
         0 to l.
         sum(t=1:l) min(prod[t], D[t][l]*setup[t]) >= D[0][l]
       */
     if(ds < D[0][l] - mo.tol) 
     {
      le = new XPRBexpr();
      for(t=0;t<=l;t++) 
      {
       if (solprod[t] < D[t][l]*solsetup[t] + mo.tol)
        le .add(prod[t]);
       else
        le .add(setup[t].mul(D[t][l]));
      }
      cutlist.add( mo.prob.newCut(le.gEql(D[0][l])) );       
      ncut++; 
     }
    }

  /* Add cuts to the problem */
    if(ncut>0)
    { 
     cuts = new XPRBcut[ncut];
     for(t=0;t<ncut;t++) cuts[t] = (XPRBcut)cutlist.get(t);
     mo.prob.addCuts(cuts);
     System.out.println("Cuts added: " + ncut + 
        " (depth " + oprob.getIntAttrib(XPRS.NODEDEPTH) +
        ", node "+ oprob.getIntAttrib(XPRS.NODES) + 
        "), obj. " + oprob.getDblAttrib(XPRS.LPOBJVAL));
    }
    mo.prob.endCB();
   }
   catch(XPRSprobException e) {
    System.out.println("Error  " + e.getCode() + ": " + e.getMessage());
   }
   return 0;
  }
 }
 
/***********************************************************************/

 static void modEls() throws XPRSexception
 {
  int s,t,k;
  XPRBexpr cobj,le; 
  
  bcl = new XPRB();                     /* Initialize BCL */
  p = bcl.newProb("Els");               /* Create a new problem in BCL */
  XPRS.init();                          /* Initialize Xpress-Optimizer */

  D = new int[T][T];
  for(s=0;s<T;s++)
   for(t=0;t<T;t++)
    for(k=s;k<=t;k++)
     D[s][t] += DEMAND[k];

/****VARIABLES****/
  prod = new XPRBvar[T];
  setup = new XPRBvar[T];
  for(t=0;t<T;t++)
  {
   prod[t]=p.newVar("prod" + (t+1));
   setup[t]=p.newVar("setup" +(t+1), XPRB.BV);   
  }

/****OBJECTIVE****/
  cobj = new XPRBexpr();
  for(t=0;t<T;t++)                      /* Minimize total cost */
   cobj .add(setup[t].mul(SETUPCOST[t]) .add(prod[t].mul(PRODCOST[t])) );
  p.setObj(cobj);

/****CONSTRAINTS****/
         /* Production in period t must not exceed the total demand for the
            remaining periods; if there is production during t then there
            is a setup in t */
  for(t=0;t<T;t++)
   p.newCtr("Production", prod[t] .lEql(setup[t].mul(D[t][T-1])) ); 

         /* Production in periods 0 to t must satisfy the total demand
            during this period of time */
  for(t=0;t<T;t++)
  {
   le = new XPRBexpr();
   for(s=0;s<=t;s++) le .add(prod[s]);
   p.newCtr("Demand", le.gEql(D[0][t]) );
  }
 }
 
/***********************************************************************/
 static void treeCutGen() throws XPRSexception
 {
  XPRSprob oprob;
  myobj mo;
  CutMgrCallback cb;
  double feastol;
  int starttime,t;

  starttime=XPRB.getTime();
 
  oprob = p.getXPRSprob();                    /* Get Optimizer problem */

  oprob.setIntControl(XPRS.LPLOG, 0);
  oprob.setIntControl(XPRS.MIPLOG, 3);

  oprob.setIntControl(XPRS.CUTSTRATEGY, 0);   /* Disable automatic cuts */
  oprob.setIntControl(XPRS.PRESOLVE, 0);      /* Switch presolve off */
  oprob.setIntControl(XPRS.EXTRAROWS, 5000);  /* Reserve extra rows */

  feastol=oprob.getDblControl(XPRS.FEASTOL);  /* Get zero tolerance */
  feastol*= 10;

  mo = new myobj();
  mo.prob=p;
  mo.tol=feastol;
  p.setCutMode(1);
  cb = new CutMgrCallback();
  oprob.addCutMgrListener(cb, mo);

  p.mipOptimize("");                          /* Solve the MIP */
  System.out.println("(" + (XPRB.getTime()-starttime)/1000.0 +
    " sec) Global status " + p.getMIPStat() + ", best solution: " +
    p.getObjVal());  

      /* Print out the solution: */
  for(t=0;t<T;t++)
   System.out.println("Period " + (t+1) + ": prod " + prod[t].getSol()
      + " (demand: " + DEMAND[t] + ", cost: " + PRODCOST[t] + "), setup " 
      + setup[t].getSol() + " (cost: " + SETUPCOST[t] + ")"); 
 }
 
/***********************************************************************/

 public static void main(String[] args) throws XPRSprobException, XPRSexception
 {
  modEls();                         /* Model the problem */
  treeCutGen();                     /* Solve the problem */
 } 
}

© 2001-2020 Fair Isaac Corporation. All rights reserved. This documentation is the property of Fair Isaac Corporation (“FICO”). Receipt or possession of this documentation does not convey rights to disclose, reproduce, make derivative works, use, or allow others to use it except solely for internal evaluation purposes to determine whether to purchase a license to the software described in this documentation, or as otherwise set forth in a written software license agreement between you and FICO (or a FICO affiliate). Use of this documentation and the software described in it must conform strictly to the foregoing permitted uses, and no other use is permitted.