C‑1 Planning the production of bicycles: Production planning (single product) ***
modeling inventory balance; inline if, forall-do
C‑2 Production of drinking glasses: Multi-item production planning **
modeling stock balance constraints; inline if, index value 0
C‑3 Material requirement planning: Material requirement planning (MRP) **
working with index (sub)sets, dynamic initialization, finalize, create, as
C‑4 Planning the production of electronic components: Multi-item production planning **
modeling stock balance constraints; inline if
C‑5 Planning the production of fiberglass: Production planning with time-dependent production cost ***
representation of multi-period production as flow; encoding of arcs, exists, create, isodd, getlast, inline if
C‑6 Assignment of production batches to machines: Generalized assignment problem *


File(s): c1bike.mos (Mar. 2002), c2glass.mos (Mar. 2002), c3toy.mos (Mar. 2002), c4compo.mos (Mar. 2002), c5fiber.mos (Mar. 2002), c6assign.mos (Mar. 2002)
Data file(s): c1bike.dat, c2glass.dat, c3toy.dat, c4compo.dat, c5fiber.dat, c6assign.dat

c1bike.mos
(!******************************************************
   Mosel Example Problems
   ======================

   file c1bike.mos
   ```````````````
   Planning the production of bicycles
   
   (c) 2008 Fair Isaac Corporation
       author: S. Heipcke, Mar. 2002
*******************************************************!)

model "C-1 Bicycle production"
 uses "mmxprs"

 declarations   
  TIMES = 1..12                  ! Range of time periods

  DEM: array(TIMES) of integer   ! Demand per months
  CNORM,COVER: integer           ! Prod. cost in normal / overtime hours
  CSTOCK: integer                ! Storage cost per bicycle
  CAP: integer                   ! Monthly capacity in normal working hours
  ISTOCK: integer                ! Initial stock

  pnorm:array(TIMES) of mpvar    ! No. of bicycles produced in normal hours
  pover:array(TIMES) of mpvar    ! No. of bicycles produced in overtime hours
  store:array(TIMES) of mpvar    ! No. of bicycles stored per month 
 end-declarations

 initializations from 'c1bike.dat'
  DEM CNORM COVER CSTOCK CAP ISTOCK 
 end-initializations

! Objective: minimize production cost
 Cost:= sum(t in TIMES) (CNORM*pnorm(t) + COVER*pover(t) + CSTOCK*store(t))

! Satisfy the demand for every period
 forall(t in TIMES) 
  pnorm(t) + pover(t) + if(t>1, store(t-1), ISTOCK) = DEM(t) + store(t)

! Capacity limits on normal and overtime working hours per month
 forall(t in TIMES) do
  pnorm(t) <= CAP
  pover(t) <= 0.5*CAP
 end-do

! Solve the problem
 minimize(Cost)
 
! Solution printing
 declarations
  MONTHS: array(TIMES) of string  ! Names of months
 end-declarations 

 initializations from 'c1bike.dat'
  MONTHS 
 end-initializations
 
 writeln("Total cost: ", getobjval)
 write("       ")
 forall(t in TIMES) write(strfmt(MONTHS(t),4))
 write("\nDemand ")
 forall(t in TIMES) write(strfmt(DEM(t)/1000,4))
 write("\nNormal ")
 forall(t in TIMES) write(strfmt(getsol(pnorm(t))/1000,4))
 write("\nAdd.   ")
 forall(t in TIMES) write(strfmt(getsol(pover(t))/1000,4))
 write("\nStore  ")
 forall(t in TIMES) write(strfmt(getsol(store(t))/1000,4))
 writeln

end-model

c2glass.mos
(!******************************************************
   Mosel Example Problems
   ======================

   file c2glass.mos
   ````````````````
   Planning the production of glasses
   
   (c) 2008 Fair Isaac Corporation
       author: S. Heipcke, Mar. 2002
*******************************************************!)

model "C-2 Glass production"
 uses "mmxprs"

 declarations   
  NT = 12                              ! Number of weeks in planning period
  WEEKS = 1..NT 
  PRODS = 1.. 6                        ! Set of products

  CAPW,CAPM: integer                   ! Capacity of workers and machines
  CAPS: integer                        ! Storage capacity
  DEM: array(PRODS,WEEKS) of integer   ! Demand per product and per week
  CPROD: array(PRODS) of integer       ! Production cost per product
  CSTOCK: array(PRODS) of integer      ! Storage cost per product
  ISTOCK: array(PRODS) of integer      ! Initial stock levels
  FSTOCK: array(PRODS) of integer      ! Min. final stock levels
  TIMEW,TIMEM: array(PRODS) of integer ! Worker and machine time per unit
  SPACE: array(PRODS) of integer       ! Storage space required by products
  
  produce: array(PRODS,WEEKS) of mpvar ! Production of products per week
  store: array(PRODS,WEEKS) of mpvar   ! Amount stored at end of week 
 end-declarations

 initializations from 'c2glass.dat'
  CAPW CAPM CAPS DEM CSTOCK CPROD ISTOCK FSTOCK TIMEW TIMEM SPACE
 end-initializations

! Objective: sum of production and storage costs
 Cost:= 
  sum(p in PRODS, t in WEEKS) (CPROD(p)*produce(p,t) + CSTOCK(p)*store(p,t))

! Stock balances
 forall(p in PRODS, t in WEEKS)
  store(p,t) = if(t>1, store(p,t-1), ISTOCK(p)) + produce(p,t) - DEM(p,t)

! Final stock levels
 forall(p in PRODS) store(p,NT) >= FSTOCK(p)

! Capacity constraints 
 forall(t in WEEKS) do
  sum(p in PRODS) TIMEW(p)*produce(p,t) <= CAPW     ! Workers
  sum(p in PRODS) TIMEM(p)*produce(p,t) <= CAPM     ! Machines
  sum(p in PRODS) SPACE(p)*store(p,t)   <= CAPS     ! Storage
 end-do

! Solve the problem
 minimize(Cost)
 
! Solution printing
 writeln("Total cost: ",getobjval)
 writeln("Production plan:")
 write("     Week")
 forall(t in WEEKS) write(strfmt(t,7))
 writeln
 forall(p in PRODS) do
  write(p,": Prod. ")
  forall(t in WEEKS) write(strfmt(getsol(produce(p,t)),7))
  writeln
  write("   Store ")
  forall(t in WEEKS) write(strfmt("("+getsol(store(p,t))+")",7))
  writeln
 end-do

 writeln("\nCapacities used:")
 writeln("Week",strfmt("Workers",8),strfmt("Machines",9),strfmt("Space",7))
 forall(t in WEEKS) 
  writeln(strfmt(t,2),
   strfmt(getsol(sum(p in PRODS) TIMEW(p)*produce(p,t)),8),
   strfmt(getsol(sum(p in PRODS) TIMEM(p)*produce(p,t)),10,2),
   strfmt(getsol(sum(p in PRODS) SPACE(p)*store(p,t)),9,2) ) 
	   
end-model

c3toy.mos
(!******************************************************
   Mosel Example Problems
   ======================

   file c3toy.mos
   ``````````````
   Planning the production of toy lorrys
   
   (c) 2008 Fair Isaac Corporation
       author: S. Heipcke, Mar. 2002
*******************************************************!)

model "C-3 Toy production"
 uses "mmxprs"

 declarations   
  ITEMS: set of string                 ! Set of all products
  FINAL: set of string                 ! Set of final products
  ASMBL: set of string                 ! Set of assembled products
  PREPROD: set of string               ! Set of preproducts

  CAP: array(ASMBL) of integer         ! Capacity of assembly lines
  DEM: array(FINAL) of integer         ! Demand of lorrys
  CPROD: array(ASMBL) of real          ! Assembly costs
  CBUY: array(ITEMS) of real           ! Purchase costs
  REQ: array(ASMBL,PREPROD) of integer ! Items req. for assembling a product
 end-declarations

 initializations from 'c3toy.dat'
  DEM CBUY REQ
  [CPROD, CAP] as 'ASSEMBLY'
 end-initializations

 finalize(ASMBL); finalize(PREPROD); finalize(FINAL); finalize(ITEMS)

 declarations   
  produce: array(ASMBL) of mpvar       ! Quantity of items produced
  buy: array(PREPROD) of mpvar         ! Quantity of items bought 
 end-declarations

! Objective: total costs
 Cost:= sum(p in PREPROD) CBUY(p)*buy(p) + 
         sum(p in ASMBL) CPROD(p)*produce(p)

! Satisfy demands
 forall(p in FINAL) produce(p) >= DEM(p)

! Assembly balance
 forall(p in PREPROD) buy(p) + if(p in ASMBL, produce(p), 0) >= 
                       sum(q in ASMBL) REQ(q,p)*produce(q)

! Limits on assembly capacity
 forall(p in ASMBL) produce(p) <= CAP(p)

 forall(p in PREPROD) buy(p) is_integer
 forall(p in ASMBL) produce(p) is_integer

! Solve the problem
 minimize(Cost)
 
! Solution printing
 writeln("Total cost: ",getobjval)
 writeln("Buy:")
 forall(p in PREPROD)
  writeln("  ", strfmt(p,-18), ": ", strfmt(getsol(buy(p)),5)) 
 writeln("Produce:")
 forall(p in ASMBL)
  writeln("  ", strfmt(p,-18), ": ", strfmt(getsol(produce(p)),5)) 

end-model

c4compo.mos
(!******************************************************
   Mosel Example Problems
   ======================

   file c4compo.mos
   ````````````````
   Planning the production of electronic components
   
   (c) 2008 Fair Isaac Corporation
       author: S. Heipcke, Mar. 2002
*******************************************************!)

model "C-4 Electronic components"
 uses "mmxprs"

 declarations   
  NT = 6                                 ! Number of time periods (months)
  MONTHS = 1..NT
  PRODS = 1..4                           ! Set of components

  DEM: array(PRODS,MONTHS) of integer    ! Demand of components per month
  CPROD: array(PRODS) of integer         ! Production costs
  CSTOCK: array(PRODS) of real           ! Storage costs
  CADD,CRED: real                        ! Cost of additional/reduced prod.
  ISTOCK,FSTOCK: array(PRODS) of integer ! Initial and final stock levels

  produce: array(PRODS,MONTHS) of mpvar  ! Quantities produced per month
  store: array(PRODS,MONTHS) of mpvar    ! Stock levels at end of every month
  reduce: array(MONTHS) of mpvar         ! Reduction of production per month 
  add: array(MONTHS) of mpvar            ! Increase of production per month 
 end-declarations

 initializations from 'c4compo.dat'
  DEM CPROD CSTOCK CADD CRED ISTOCK FSTOCK
 end-initializations

! Objective: total cost of production, storage, and change of prod. level
 Cost:= sum(p in PRODS, t in MONTHS) (CPROD(p)*produce(p,t) + 
                                      CSTOCK(p)*store(p,t)) +
        sum(t in 2..NT) (CRED*reduce(t) + CADD*add(t))

! Stock balance constraints (satisfy demands)
 forall(p in PRODS, t in MONTHS)
  store(p,t) = if(t>1, store(p,t-1), ISTOCK(p)) + produce(p,t) - DEM(p,t)

! Changes to the level of production 
 forall(t in 2..NT) 
  sum(p in PRODS) (produce(p,t) - produce(p,t-1)) = add(t) - reduce(t)

! Guarantee final stock levels
forall(p in PRODS) store(p,NT) >= FSTOCK(p)

! Solve the problem
 minimize(Cost)
 
! Solution printing
 declarations
  PNAME: array(PRODS) of string          ! Product names
 end-declarations 

 initializations from 'c4compo.dat'
  PNAME 
 end-initializations

 writeln("Total cost: ",getobjval)
 write(strfmt("Month",13))
 forall(t in MONTHS) write(strfmt(t,5))
 forall(p in PRODS) do
  write("\n", PNAME(p), ": Prod. ")
  forall(t in MONTHS) write(strfmt(getsol(produce(p,t)),5))
  write("\n", strfmt("Store ",14))
  forall(t in MONTHS) write(strfmt("("+getsol(store(p,t))+")",5))
 end-do
 write("\nTotal         ")
 forall(t in MONTHS) write(strfmt(sum(p in PRODS) getsol(produce(p,t)),5))
 writeln

end-model

c5fiber.mos
(!******************************************************
   Mosel Example Problems
   ======================

   file c5fiber.mos
   ````````````````
   Planning the production of fiberglass
   
   (c) 2008 Fair Isaac Corporation
       author: S. Heipcke, Mar. 2002, rev. Nov. 2017
*******************************************************!)

model "C-5 Fiberglass"
 uses "mmxprs"

 declarations   
  NODES: range                           ! Production and demand nodes
                                         ! odd numbers: production capacities
                                         ! even numbers: demands

  ARC: dynamic array(NODES,NODES) of real   ! Cost of flow on arcs
  WEIGHT: array(NODES) of integer           ! Node weights (capacities/demand)

  flow: dynamic array(NODES,NODES) of mpvar ! Flow on arcs   
 end-declarations

 initializations from 'c5fiber.dat'
  ARC WEIGHT
 end-initializations

 forall(m,n in NODES | exists(ARC(m,n))) create(flow(m,n))

! Objective: total cost of production and storage
 Cost:= sum(m,n in NODES | exists(ARC(m,n))) ARC(m,n)*flow(m,n)

! Satisfy demands (flow balance constraints)
 forall(n in NODES | isodd(n)=FALSE)
  if(n>2, flow(n-2,n), 0) + flow(n-1,n) = 
   if(n<getlast(NODES), flow(n,n+2), 0) + WEIGHT(n)

! Production capacities
 forall(n in NODES | isodd(n)) flow(n,n+1) <= WEIGHT(n)

! Solve the problem
 minimize(Cost)
 
! Solution printing
 writeln("Total cost: ",getobjval)
 write("Week")
 forall(t in 1..integer(getlast(NODES)/2)) write(strfmt(t,5))
 write("\nProd.")
 forall(n in NODES | isodd(n)) 
  write(strfmt(getsol(sum(m in NODES) flow(n,m)),5))
 write("\nStock")
 forall(n in NODES | not(isodd(n))) 
  write(strfmt(getsol(sum(m in NODES) flow(n,m)),5))
 writeln

end-model

c6assign.mos
(!******************************************************
   Mosel Example Problems
   ======================

   file c6assign.mos
   `````````````````
   Machine assignment for production batches
   
   (c) 2008 Fair Isaac Corporation
       author: S. Heipcke, Mar. 2002
*******************************************************!)

model "C-6 Machine assignment"
 uses "mmxprs"

 declarations   
  MACH = 1..5                        ! Set of machines
  PRODS = 1..10                      ! Set of production batches

  CAP: array(MACH) of integer        ! Machine capacities
  DUR: array(MACH,PRODS) of integer  ! Production durations
  COST: array(MACH,PRODS) of integer ! Production costs

  use: array(MACH,PRODS) of mpvar    ! 1 if machine assigned to batch, 
                                     ! 0 otherwise
 end-declarations

 initializations from 'c6assign.dat'
  DUR CAP COST
 end-initializations

! Objective: total production cost
 Cost:= sum(m in MACH, p in PRODS) COST(m,p)*use(m,p)

! Assign a single machine to every batch
 forall(p in PRODS) sum(m in MACH) use(m,p) = 1

! Limits on machine capacities
 forall(m in MACH) sum(p in PRODS) DUR(m,p)*use(m,p) <= CAP(m)

 forall(m in MACH, p in PRODS) use(m,p) is_binary

! Solve the problem
 minimize(Cost)
 
! Solution printing
 writeln("Total cost: ",getobjval)
 forall(m in MACH) do
  write("Machine ", m, ": ")
  forall(p in PRODS) 
   if (getsol(use(m,p))=1) then
    write(p, " ")
   end-if
  writeln(" (total duration: ", getsol(sum(p in PRODS) DUR(m,p)*use(m,p)), ")")
 end-do

end-model

© 2001-2020 Fair Isaac Corporation. All rights reserved. This documentation is the property of Fair Isaac Corporation (“FICO”). Receipt or possession of this documentation does not convey rights to disclose, reproduce, make derivative works, use, or allow others to use it except solely for internal evaluation purposes to determine whether to purchase a license to the software described in this documentation, or as otherwise set forth in a written software license agreement between you and FICO (or a FICO affiliate). Use of this documentation and the software described in it must conform strictly to the foregoing permitted uses, and no other use is permitted.