Initializing help system before first use

Example

We want to add two parameters to the module defining a task structure that was presented in the previous chapter: the maximum length of name strings used for reading in tasks (tasknamelength, an integer value) and a time limit value (taskmaxtime, a real). These parameters might be used as follows in a model (assuming t is an array of tasks):

 if(getparam("tasknamelength")<10) then
  setparam("tasknamelength",20)
 end-if

 t(3):=task("three",getparam("taskmaxtime"))

© 2001-2020 Fair Isaac Corporation. All rights reserved. This documentation is the property of Fair Isaac Corporation (“FICO”). Receipt or possession of this documentation does not convey rights to disclose, reproduce, make derivative works, use, or allow others to use it except solely for internal evaluation purposes to determine whether to purchase a license to the software described in this documentation, or as otherwise set forth in a written software license agreement between you and FICO (or a FICO affiliate). Use of this documentation and the software described in it must conform strictly to the foregoing permitted uses, and no other use is permitted.