TIMELIMIT
|
Description
|
|||
|
Type
|
Double
|
||
|
Topic area
|
|||
|
Values
|
|
||
|
Default value
|
1e+20
|
||
|
Unit
|
seconds
|
||
|
Notes
|
This control has been newly introduced with Xpress Optimizer version 9.0 and should be used instead of the deprecated
MAXTIME control. Note that the meaning of positive values differs between TIMELIMIT and
MAXTIME. When both controls are set, TIMELIMIT takes precedence. The functionality of positive
MAXTIME values is covered by
SOLTIMELIMIT.
When
TIMELIMIT is set on an objective using
XPRSsetobjdblcontrol, then when the limit is reached the solver will stop the current solve but will continue with solving the next objective. This is in contrast to the behaviour when
TIMELIMIT is set on the problem with
XPRSsetdblcontrol, where the overall optimization will be terminated as soon as the limit is reached.
When a
TIMELIMIT of 0 is set, the solver will stop immediately.
|
||
|
Affects routines
|
|||
|
See also
|
|||
|
Category
|
Control
|
© 2001-2026 Fair Isaac Corporation. All rights reserved. This documentation is the property of Fair Isaac Corporation (“FICO”). Receipt or possession of this documentation does not convey rights to disclose, reproduce, make derivative works, use, or allow others to use it except solely for internal evaluation purposes to determine whether to purchase a license to the software described in this documentation, or as otherwise set forth in a written software license agreement between you and FICO (or a FICO affiliate). Use of this documentation and the software described in it must conform strictly to the foregoing permitted uses, and no other use is permitted.
